1. Kind of construction – monolithic with thermal power station, with heat insulation columns, slabs and outside walls, with guaranteed quality of the materials under BDS.
(A) Apartment:
|
- electric power lines, water-supply and sewerage systems |
Installations coordinated with the CONTRACTOR (water supply and sewerage systems are with PVC pipes and the sewerage system is with a collector box) up to 20 days after completion of the inner masonry. |
|
- living-room |
Walls – plaster puttying; with acrylic painted finish |
|
|
ceiling – plaster puttying; with acrylic painted finish |
|
|
floor – cement coating with sound insulation and solid timber covering. |
|
- bedrooms |
Walls – plaster puttying; with acrylic painted finish |
|
|
ceiling – plaster puttying; with acrylic painted finish |
|
|
floor – cement coating with sound insulation and underlay and carpet. |
|
|
|
|
- kitchen and dining room
|
Walls – plaster puttying; with acrylic painted finish ceiling – plaster puttying; with acrylic painted finish |
|
- balconies |
floor – cement coating with sound insulation and tiles. Kitchens fully equipped with built in appliances and cupboards. As per project, floor with cold-resistant granite-grease and hydro insulation. |
|
- Common areas |
Finished to a high standard, floors with marble tiling and walls and ceilings painted in neutral colors. |
|
Floor – cement coating with sound insulation
| |
|
- bathroom and WC |
Ceilings – lime-cast and painted in enamel paint. |
|
|
floor – cement coating and tiled |
|
|
walls – lime-cast and tiled.
|
|
- brickworks - inside |
Coordinated with the CONTRACTOR up to 20 days after completion of the floor slab above the apartment
|
|
- doors |
Front door – armored with trilateral alignment lock |
|
|
inside – MDF with seals painted in enamel.
|
|
- windows |
PVC – five chamber frame German profile – opening as per project (one window in each room with two-plane opening), inside window sills.
|
|
- radiators |
Panel aluminum with installed thermostat screws. |
|
|
|
|
(B) Staircase and landings |
- Floor granite-grease or marble plates. - walls and ceiling, Latex. |
|
|
|
|
|
|
|
(C) Elevator |
Installed controlled equipment under BDS with machine-room on the basement floor (hydraulic lift). |
|
|
|
|
(D) Car Park |
- Floor, concrete. |
|
|
- Walls and ceilings, Lime-cast. |
2. Installations:
Electric power lines – equipped with two-tariff rate measurement devices, water supply and sewerage systems – equipped with water meters for hot and cold water, heating system, phone lines, electric bell and intercom system, antenna network under BDS, installed all outside connections and communication with granted permits for connection.
3. Finished building-site vertical leveling – as per project of the CONTRACTOR – fence, garden lighting, alleys, greenbelt setting. There will be additional monthly costs for maintenance of the courtyard, entrance and guards, as per additional annex to the preliminary agreement.